Configured for the grid code
Signal lists, setpoints and communication are aligned with the operator involved in your project.
GRID COMPLIANCE & REMOTE CONTROL
Keep energy assets compliant, controllable and ready for the grid’s next requirement. SmartgridOne connects grid-operator signals to your installation and turns them into safe, measurable actions across batteries, PV, EV charging and flexible loads.
WHAT IS TELECONTROL?
Telecontrol lets a grid operator monitor an installation remotely and intervene when needed: reading power, voltage and current, but also imposing power limits or disconnecting.
The communication runs over an RTU, using the protocol required by the operator. SmartgridOne treats every signal as a clear operating constraint while local safety limits remain active.
TELECONTROL INTEGRATION, END TO END
A project is ready when the complete chain works: the operator commands, the controller regulates, and the site reports back with real measurements.
BUILT FOR REAL PROJECTS
Requirements differ by country, connection and operator. We configure the signals, priorities and fallback behaviour around the approved project design.
Signal lists, setpoints and communication are aligned with the operator involved in your project.
Local limits and fail-safe behaviour remain active when a communication link is interrupted.
We validate the full control loop from the operator interface to the physical response on site.
Clear signal lists, commissioning results and handover support make certification easier.
WHERE TELECONTROL ADDS VALUE
SmartgridOne coordinates the response across compatible devices and keeps telecontrol aligned with local optimisation, market participation and site-level priorities.
WHY ENIRIS
Telecontrol does not have to be an isolated box next to your EMS. With SmartgridOne, grid signals, local energy flows and commercial optimisation are handled in one platform.
That gives project teams one place to configure priorities, monitor performance and extend the installation as requirements change.
FREQUENTLY ASKED QUESTIONS
That depends on the country, grid operator, connection agreement and characteristics of the installation. We help identify the applicable requirements during project design.
The interface depends on the project. SmartgridOne can work with operator-approved RTU and communication setups, including IEC 60870-5-104 and digital I/O where required.
The controller follows the configured fallback and safety rules. Local limits and site protection remain active, and the behaviour can be tested during commissioning.
Yes. Grid-operator commands are treated as control constraints with the agreed priority. Remaining flexibility can continue to support local optimisation or market strategies.
READY FOR THE NEXT PROJECT?
Share your country, grid operator, connection size and asset mix. We will help map the required signals, interfaces and control logic into a project-ready solution.