With a capacity tariff, a short demand peak can affect the grid-cost component of the bill. SmartgridOne monitors the grid connection and coordinates batteries and controllable loads to stay closer to a configured power limit.

The embedded video shows how SmartgridOne coordinates batteries and flexible loads to limit avoidable power peaks. It explains the control principle directly on this page, so there is no need to open a separate video link.
A capacity tariff links part of the electricity bill to the highest power drawn from the grid during a defined measurement period. A site may consume a reasonable amount of energy over a month and still incur avoidable costs when several large loads run simultaneously. EV charging, heat pumps, production equipment and an empty battery can together create a short but expensive peak.
The exact calculation method, measurement interval and billing period depend on the electricity supplier, distribution grid operator and contract. A sound peak-shaving project therefore starts with the applicable tariff rules and real interval measurements, rather than with an arbitrary power limit.
SmartgridOne continuously monitors the point of grid connection and compares the measured power with a configured threshold. When demand approaches that threshold, the EMS coordinates available assets according to clearly defined priorities. A battery can discharge, an EV charger can temporarily reduce its charging power, or another flexible load can be shifted to a quieter moment.
This is more than a simple on/off rule. The control strategy has to preserve battery reserve, user comfort, production schedules and device limits. SmartgridOne provides one vendor-independent control layer for compatible batteries, charging stations, heat pumps, solar inverters and meters, enabling the installer to configure those priorities centrally.
The same SmartgridOne installation can also increase self-consumption, respond to dynamic electricity prices and prepare the site for grid-control signals. Those objectives should not compete blindly. Safety limits, mandatory grid requirements and the site's operational needs must always take priority over cost optimisation.
For a reliable result, start with the applicable Swiss tariff and the technical requirements of the local DSO. Then verify supported devices, agree the control priorities with the customer and complete a full commissioning test before handover.
Open the battery peak-shaving guide →
Explore all local control modes → Configure the energy contract →
After commissioning, review the savings estimate and measured result →